Pittsburgh bridges reopen after 26 barges break loose

ByNadine El-Bawab and Matt Foster ABCNews logo
Saturday, April 13, 2024
ABC7 Chicago 24/7 Stream
ABC7 Chicago 24/7 StreamLive streaming newscasts, breaking news, weather & original, local programming.

PITTSBURGH -- Twenty-six barges broke loose and floated uncontrolled down the Ohio River Friday night, according to the Pittsburgh Public Safety Office.

The West End Bridge was closed in both directions and rail traffic was shut down on the rail bridge to Brunot Island due to the loose barges, before reopening on Saturday.

Of those that broke loose, 23 were loaded with dry cargo, such as coal, and three were empty. The barges are owned or operated by the Campbell Transportation Company.

There are no reported injuries, but Peggy's Marina sustained extensive damage.

SEE ALSO | Salvage crews have begun removing containers from the ship that collapsed Baltimore's Key bridge

Of the barges, 11 were located and pinned against the river bank by Brunot Island, 14 continued down the river and six went over the Emsworth Dam.

The company that owns the barges told ABC affiliate WTAE in a statement that "the incident occurred under high water conditions on the rivers resulting in strong currents due to flooding in the area."